U2 – Infill and Prefabrication

U2 – Session 6:
Building Details

U1-IntroductionObjectives:

Trainees …

  • know the details of a wall (connections foundation-wall, wall-window/door, wall-ceiling, wall-corner-wall, wall-roof) for the different infill building techniques.
  • can fix a bottom plate to the foundation, install a window frame, make a corner and a ringbeam (for roof or intermediate ceiling).

Methods:

  • lecture/talk
  • explanations
  • practice

Theory:

  • details of a wall (connections foundation-wall, wall-window/door, wall-ceiling, wall-corner-wall, wall-roof) for the different infill building techniques

Practice/Task:

  • drawing of different details of a wall (connections foundation-wall, wall-window/door, wall-ceiling, wallcorner-wall, wall-roof) for the different infill building techniques
  • prepare (crosscut), assemble, raise and connect a wall with bottom plate, ring beam, window and corner

Materials/Documents:  U2 S6 – Session Plan


Training Time: 1 day

Merken

Merken